Projects

SOS Bonifiche has consolidated, cross-disciplinary expertise across all its core sectors. Over the years, the company has managed complex and multifaceted operations, ensuring the safety and successful execution of major infrastructural, industrial and land remediation works.

 

The experience gained in the field today represents a strategic asset, enabling the company to operate with reliability and consistency while guaranteeing executive precision and high-quality standards in every project.

UXO Clearance Area

Installation of aircraft arresting barriers and relocation of ILS lines at Venegono Superiore Airport (Varese).

UXO Clearance Area

Municipality of Eraclea - Valle Ossi Rural Tourist Village - Urbanization works and UMI 1 open-air tourist village.

Expansion of the BIOGAS plant / Medea (Province of Gorizia).

Alcoa Site, Fusina, Municipality of Venice (VE) / Systematic Land UXO Clearance services, preparatory to the construction of permanent safety measures in the subsoil.

UXO Clearance Area

▸ Road network redevelopment from SR 177 to SR 464 Barbeano Bypass, Municipality of Spilimbergo (PN) - Administrative Delegation Decree no. PMT/222/VS.1.0.20 dated 03.06.2010.

 

Safety Area

Chioggia Hospital - Safety securing of hospital complex roofs using fall protection lifelines and fixed guardrails.

Former Pordenone Fair - Safety securing of two roofs within the property complex using fall protection lifelines.

Aviano Middle Schools - Design of guardrail systems and material supply via our partner's construction warehouse.

Marco Polo Airport - Safety securing of a roof section using fall protection lifelines and fixed guardrails, including the installation of a fixed vertical ladder.

Safety Area

▸ Activities related to working at height for the maintenance of the tide gauge network and environmental sensors on facilities overlooking the Adriatic Sea.

Safety Area

▸ "Old" Lodi Hospital - Safety securing of roofs using fall protection lifelines.

Sacile Elementary School - Design of fall protection systems and material supply via our partner's construction warehouse.

Safety Area

▸ Como Calcio - Safety securing of roofs using fall protection lifelines (Buildings 3 + 6).

UXO Clearance Area

▸ PADOVA-CASTELFRANCO Line - Doubling of the Brenta River crossing tracks.

▸ Construction of new Data Centers Former Canteen area.

UXO Clearance Area

SNAM Construction Site Connection upgrade in the Municipality of Mozzate, DN 250 (10”) and related works.

Tender Outcome Notification - (PC-E-816) Systematic Land UXO Clearance of the public interest excavation area for the raising of the main embankment on the right bank of the Po River, for the adjustment to the final profile required by the SIMPO plan – 2nd functional lot.

 

Safety Area

▸ Udine Hospital - Safety securing of various roofs using fall protection lifelines.

Safety Area

▸ Lignano Sabbiadoro School Hub - Safety securing of roofs using fall protection lifelines across the upper-level school building, lower-level school building, Gymnasium and Canteen.

Safety Area

Palazzo Ancilotto - Safety securing of an internal lightwell using a fixed vertical ladder equipped with an EN 353-2 vertical fall arrest system and installation of structural steel landings featuring lockable hatches across various sections.

UXO Clearance Area

▸ A2A Headquarters, Piazza Trento - Systematic Land UXO Survey activities.

UXO Clearance Area

Works: Brotton – Viale Ferrarin (Vicenza) – Del Din Barracks – Renovation of selected buildings and urban redevelopment. Notice NP 16-130, Contract no. W912PF-17-C-0008.

UXO Clearance Area

Drafting of the definitive and executive designs and execution by any means of the works for the A4 Motorway - Mestre Bypass (Passante di Mestre), including the provision of construction supervision services.

Contact our team
Would you like to learn more about the operations conducted by SOS Bonifiche? Fill out the form and one of our specialized operators will answer your requests.